We’ve Boosted! What this means for you

From 16 June 2025, we’ve upgraded our Home Fibre plans. These changes are now live, but while some documents on this site may still reference the old plan names, rest assured, the new speeds apply. Find out more.

Close
Feedback

We’re introducing changes to Exchange Space pricing from 1 May 2020

What’s changing

In line with Producer Pricing Index (PPI) increase, we are increasing the monthly recurring charges for Exchange Space colocation footprints by 2.07%.

The new pricing will be effective from 1 May 2020.

Supporting details

 
Footprints
 

Existing charges

Revised charges

Steel

$244.22

$249.28

Bronze

$363.48

$371.01

Silver

$579.30

$591.30

Gold

$1,817.41

$1,855.05

Platinum

$2,158.18

$2,202.88

 

Service provider space - existing charges per square meter
 

Steel

Bronze

Silver

Gold

Platinum

Building Costs

$63.73

$64.24

$79.12

$586.00

$647.90

Air Conditioning

$7.51

$3.85

$14.63

$48.39

$55.57

Base Power Infrastructure

$9.06

$18.38

$25.19

$119.53

$121.89

Battery/UPS

$33.28

$22.77

$30.94

$44.35

$83.93

Generator

$0.00

$15.69

$9.13

$53.63

$107.27

 

$113.59

$124.95

$159.02

$851.91

$1,016.62

Service provider space - revised charges per square meter

 

Steel

Bronze

Silver

Gold

Platinum

Building Costs

$65.05

$65.58

$80.77

$598.14

$661.35

Air Conditioning

$7.67

$3.93

$14.93

$49.39

$56.71

Base Power Infrastructure

$9.25

$18.76

$25.71

$122.01

$124.43

Battery/UPS

$33.97

$23.25

$31.58

$45.27

$85.68

Generator

$0.00

$16.03

$9.32

$54.74

$109.50

 

$115.94

$127.55

$162.31

$869.55

$1,037.68

 

Next steps

Please note that the CSA Service Appendix - Schedule 3 Price List for the Exchange Space Service  will be updated on the service provider website by 1 May 2020.

For any queries, please get in touch with your Account Lead.