We’ve Boosted! What this means for you

From 16 June 2025, we’ve upgraded our Home Fibre plans. These changes are now live, but while some documents on this site may still reference the old plan names, rest assured, the new speeds apply. Find out more.

Close
Feedback
Title
Set-up requirements

You can order HSNS Lite without any prerequisites other than the handover connectivity.

For this you will need:

  • An Ethernet handover connection off the local point of interconnect (POI), or tail extension to a handover connection at a remote POI.
  • Fibre connecting the handover connection to your equipment in the co-located space in the POI or at a remote site.